Building - Notification of a building project that is subject to exemption from approval
Service Description
You do not need planning permission for certain building projects if the requirements for permissibility under building planning law are met and the local authority agrees.
Instead of a building permit, only a notification is required.
Unless the municipality requires a simplified building permit procedure, the project is exempt from approval.
For example, smaller buildings are exempt from approval if they are to be erected in an area with a development plan and do not deviate from this plan.
If you wish to deviate from the development plan, you must apply to the responsible building supervisory authority before the permit exemption is granted.
Construction can begin after one month if the local building authority does not require a simplified building permit procedure to be carried out beforehand.
As no building permit is issued, the building owner is solely responsible for compliance with all requirements that his building project must meet.
In Thuringia, the following applies to projects for which no building permit is expected to be required, but which must be notified:
The construction of selected smaller projects within the scope of a development plan does not require planning permission if the provisions of the development plan are complied with and the development is secured.
Projects of this type must be submitted to the municipality for review.
The review takes place in an approval exemption procedure.
Process flow
The building owner must submit the required documents to the municipality.
The municipality shall immediately submit a copy of the documents to the lower building supervisory authority, unless it is itself the building supervisory authority.
The municipality may declare that a review of the requirements for exemption from approval should be carried out in a simplified building approval procedure or that there are other reasons for carrying out the simplified approval procedure.
Who should I contact?
Contact the Lower Building Supervisory Authority.
Which documents are required?
In addition to the application form, all documents required for the assessment of the project must be submitted:
Construction drawings
building description
Extract from the real estate map
proof of structural engineering
Proof of parking space
Application for deviation or exemption
What are the fees?
Depending on the chargeable building value in accordance with the administrative cost schedule of the Building Fees Ordinance.
Legal basis
Applications / forms
Objection, complaint
Appeal
Contact the lower building supervisory authority.
Some authorities provide application forms on their websites or use an online service.
What else should I know?
The exemption from approval does not release you from the requirements to prepare and check the structural engineering certificates.
Supporting institutions
If a simplified approval procedure is to be carried out, the lower building supervisory authority is responsible for issuing a building permit.
Author
The text was automatically translated based on the German content.
Technically approved by
Thuringian Ministry for Digital Affairs and Infrastructure
Professionally released on
15.12.2025
Source: Zuständigkeitsfinder Thüringen (Linie6Plus)